Date
Name
Trail
Hours
Work
Volunteers
Remaining Work
Comments
2020-01-05James F GreenCoon Hollow Path82020 Trail assessment and planning.Bob Flagg, James M Green, Daniel P GreenClear water bars (numerous). Repair trailhead markers (contact DCR)James M. Green and Daniel P. Green will join James F Green as co-adopters of Raccoon Hollow Path (a.k.a. Coon Hollow Path).
2020-01-01Anna MacdougallHalf Way Path1.15Removed some downed branches, but trail is in good shape.
2020-01-11James F GreenCoon Hollow Path10.5Routine maintenance of 10 waterbars on lower trail (from trailhead to marker #1120).James M Green, Daniel P GreenContinue maintenance of remaining water bars.Unseasonably warm; low 60's. Trail in heavy use by mountain bikers and hikers. Trailhead and Trail terminus trail signs damaged.
2020-01-25Bob FlaggBorder Path1Removed branches from trail from Unquity Rd to 1224. Cleaned swale near 1215.
2020-01-25Bob FlaggMassasoit Path (FBH)2Cut back trees overhanging trail, removed rocks from culvert near 1215. Brushed full length of trail.Could use a little more work on the far end of the trail to remove brush and green briar encroaching on the trail.
2020-01-23Bob VogelFive Corners Path2Picked up downed sticks, etc.
2020-03-15Anna MacDougallHalf Way Path1Trail is in good shape. All down branches have been removedNo wildlife spotted
2020-03-15Anna MacDougallHalf Way Path1Trail is in good shape. All down branches have been removedNo wildlife spotted
2020-03-15Anna MacDougallHalf Way Path1Trail is in good shape. All down branches have been removedNo wildlife spotted
2020-03-10Bob VogelFive Corners Path0.75Picked up sticks, etc.
2020-03-20Bob VogelFive Corners Path1Cleared sticks, etc.Bobby Vogel
2020-03-20Bob VogelSkyline Trail North1Cut one tree leaning across trail E of 1141), which had been hung up in other trees. Cleared misc sticks. 1092 - 1162Bobby Vogel
2020-03-28Bob FlaggAccord Path2.5Performed all maintenance from 1001 to 1062, removed two large trees on the trail with assistance from biker passing by. Cleaned grade reversals further up trail toward 1001.
2020-04-15Bob VogelFive Corners Path3.5Brushed, picked up sticks from storm, cut fallen trees.MANY small trees along trail have been cut 3 - 4' high with a machete. Need to be cut off at the ground.Lots of running water all along neart the 1140 intersection area. There could be a couple water bars added. Would require a bit of digging, but would greatly improve the trail in the wet seasons.
2020-04-15Bob VogelHoughton Path0.5Brushed, picked up sticks from storm, cut fallen trees.
2020-04-15Bob VogelHoughton Hill Path0.5Brushed, picked up sticks from storm, cut fallen trees.
2020-04-15Bob VogelWolcott Path0.5Brushed, picked up sticks from storm, cut fallen trees.
2020-04-15Bob VogelWildcat Notch Path1Brushed, picked up sticks from storm, cut fallen trees.
2020-04-15Bob VogelAccord Path1.5Brushed, picked up sticks from storm, cut fallen trees.
2020-04-15Anna MacdougallHalf Way Path1.5Removed two large downed tree branches. Lots of tree damage to trees in the woods. Also, there were two trees down on the part going into Half Way Path on Accord Path (two people with a bow saw should do it)_"Just some more cleanupNo wildlife spotted at 8.30 am. Streams running good
2020-04-25Chris MullinBase Path Connector0.25Brushing
2020-04-25Chris MullinCircle Trail0.25Brushing
2020-04-25Chris MullinEustis Trail0.25Brushing
2020-04-25Chris MullinHancock Trail0.5Brushing
2020-04-25Chris MullinJeffries Trail0.25Brushing
2020-04-29Dexter RobinsonSkyline Trail West0.5Picked up trash and brought home as all reservation trash cans have been removed due to the pandemic state emergency. Assessed work needed for spring cleanup.spring cleanup: clean out water bars, remove leaf debris from stone stairs, and out of place rocks/boulders from tread-way.
2020-05-10Bob FlaggBorder Path1.25Installed swale across trail about 7 yards up the hill from Unquity Road. Water had been running down the trail making for a muddy trail.The side ditches further up the hill past 1175 require their annual cleaning up to 1135.
2020-05-08Jim GreenCoon Hollow Path2Assessed trail. Minor brushing and litter removal. Had planned to rake out water bars; deferred Too many people without required mask/face covering. Rake waterbarsTrailhead marker vandalized (previously reported).
2020-05-13Bob VogelBrookwood Road0.5Brushed A/R, picked up sticks from trail.
2020-05-13Bob VogelEliot Circle0.5Brushed A/R, picked up sticks from trail.
2020-05-13Bob VogelEliot Path (FBH)0.5Brushed A/R, picked up sticks from trail.
2020-05-13Bob VogelSkyline Trail South1Brushed A/R, picked up sticks from trail.
2020-05-13Bob VogelTrailside Path (FBH)1Brushed A/R, picked up sticks from trail.
2020-05-15Bob VogelChickadee Path (FBH)0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelChickadee Path (FBH)0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelCliff Trail (FBH)0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelCoon Hollow Path1Picked up sticks, brushed A/R. Removed downed tree, or photographed those too large to remove.
2020-05-15Bob VogelAccord Path0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelEliot Circle0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelEliot Path (FBH)0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelHalf Way Path1Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelHoughton Path0.75Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelPuddle Path0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelSamoset Path (FBH)0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelSkyline Trail North0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelSkyline Trail South0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-15Bob VogelSummit Trail0.5Picked up sticks, brushed A/R. Removed downed tree, or photographed those too large to remove.
2020-05-15Bob VogelWildcat Notch Path0.5Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove.
2020-05-20Dexter RobinsonSkyline Trail West2.25Cleaned water bars for half of the adopted section, cleaned stone stairs, removed stray rocks and heavy saturated leaf debris from tread way. Picked up trash. Put rocks and branches in areas where foot traffic is off the trail.Complete work on remaining adopted section. Cut and remove tree across trail near Rt. 138
2020-05-24Bob FlaggSummit Trail4.5Cleaned two grade reversal near top of trail and small swale downslope. Removed lots of branches, rock, leaves and other debris from culvert and long side ditch. Cleared debris from large culvert at split with Green Dot.Need to continue clearing side ditch. Also need to clear debris from brook along parking lot at trailhead.
2020-05-28Dexter RobinsonSkyline Trail West1.5Cut and moved tree across the trail near Rt. 138. Additional work on water bars. Created barriers where hikers were stepping off trail. Completed debris and trash removal on entire section.Noticed an increase in trail braiding. Barriers may need to be strengthened.
2020-06-03Anna MacDougallHalf Way Path1.25Removed small branches. All in all Path is in good shape. Will need to rake out two reverses nat time out. Very dry and two streams are flowing but slowly.
2020-06-10Dave HumphreysBorder Path8Rebuilt stone waterbar where large stones had been dislodged. Cleared, dug out, and repacked all other waterbars.Aidan Humphreys Ben MalisheskiNone
2020-06-10Dave HumphreysRotch Path1Cleared branches from path, cut up and removed from trail one fallen tree.Aidan Humphreys Ben MalisheskiNone
2020-07-06Bob FlaggWildcat Notch Path4.5Brushed trail from Hillside St to 1083 removing small trees and overhanging branches. Cleaned all drainage structures including double culvert near 1083. Performed cleanup of parking lot near trailhead. Took measurements of log bridge to add planks.
2020-07-23Dexter RobinsonSkyline Trail West2Blocked off-trail usage area, cleaned water bars, cleared rock debris from stone stairs, brushed from Rt. 138 to Eliot Circle Trail, picked up trashoverall trail is in good shape
2020-07-31Bob VogelFive Corners Path0.75Cleared sticks 1135 to 1141. Checked waterbars, they were OK.
2020-08-10Bob VogelFive Corners Path1Picked up sticks from 1141 to Blue Hill River Road. Cut one tree bowing into trail.
2020-08-08Bob FlaggHalf Way Path3Performed maintenace on length of trail. Removed rocks blocking the 24" culvert. Cleaned large grade reversal just up the hill from the smaller culvert. Also redirected the outflow from the grade reversal at the top of the trail as water was flowing back onto trail instead of the woods.Keep an eye on the waterflow from the grader reversal at the top of the trail.
2020-08-15Bob FlaggBorder Path9Cleaned side ditches and grade reversals from Unquity up past 1165.Matt Panucci, Quinn Panucci, Zoey Panucci, Ethan Sokol, Anna MacDougall, Amir Degany, Joe GreeleyThere are two railroad tie waterbars that have rebar rod ends sticking up from tie. These need to be pounded in or sawed off as they are a hazard.
2020-08-15Bob FlaggEustis Trail4.5Cleaned grade reversals from 1166 to Chestnut Run.Anna MacDougall, Amir Degany, Joe Greeley
2020-08-15Bob FlaggChestnut Run Path2.5Cleaned two grade reversals near the 1075 end of trail that were filled in and not functioning.Matt Panucci, Quinn Panucci, Zoey Panucci
2020-08-17Steve MurphyBrookwood Trail2Working up from Blue Hill River Road, cleared all encroaching small brush and plants leaning into the trail. Half way up the trail, cut down two small trees (approx. 20 feet tall) that were snapped in half from the wind and were tee pee-d directly over the trail. Dragged two previously cut trees from the trail edge further off the trail. Raked out 3 water bars off accumulated brush and leaves to allow water to drain more easily No trash found on the trail
2020-08-20Judy JacobsWolcott Path10Raked side ditches.Don Hagerty, Anna MacDougal, James Briand, Amanda Ford, Mary BlanchetteMore raking.
2020-09-04Anna MacDougallHalf Way Path1Bushing back small branches, raked out two reversesBoth streams are not running one has a very small amount of water left the other is completely dry
2020-09-05Bob FlaggWolcott Path1.5Cleaned two grade reversals, one just before 1141 and the second just past 1141. A large rock hit been loosened but it was too high in the structure. Selected a different rock and rearrainged another rock to fix structure.There is a large grade reversal right after the Summit Rd that needs to be dug out and some large rotted logs removed to restore flow off the road. Also two grade reversals on either side of the side trail from Wildcat Notch Path need to be improved.
2020-10-02Ruth BigioEliot Circle10Eliot Circle Trail. Starting at #1030 to #1045 (crossing Summit Rd) to #1055. Brushing as needed. Not very overgrown but we cut back and brushed to Summit Rd. Trail widens at #1045, DCR vehicles use this section of the path. We continued to brush and cut back as per instructions from DCR. Continue on Eliot Circle from #1063, #1066 back to #1030. Pick up trash along trail.Jean Beebe, Anna McDougall, Marnie Bolstad, Nancy DimockWe suggest that DCR replace a trash bin by Eliot Tower. Eliot Tower is favorite spot for picnics, families and school groups. Not excessive trash on trail, but we find if there is a trash container, it will be used. (There was one in the Spring, it was removed!)
2020-11-07Bob FlaggCoon Hollow Path33Cleaned all grade reversals from start to Wildcat Notch Trail, removed remains of large tree from trail.Suzanne Furgal, Luke Burns, Eric Saint-Armour, Luke Saint-Armour, Mary Blanchette, Lynne Stack, Steve Libbey, Mike Prokosch, Melanie Lewis, Joe Woodman
2020-11-14Skip MayslesPuddle Path11Cleared water bars and brushed trail. Spent remainder of time clearing vegetation and water bars on various other nearby trailsBill, Steve, Dan
2020-11-15James F GreenCoon Hollow Path7.5Brushed from Wildcat to Summit.Daniel Green, James M Greenencountered large Buck with impressive array of antlers near trail marker #1120
2020-11-14Bob FlaggBase Path1.5Pounded in three spikes that were sticking up from the railroad tie waterbars on trail, removed a lot of green briar near the homestead site near Unquity Road.
2020-11-18Bob FlaggSkyline Trail South2Performed annual maintenance on trail from Hillside St to 1143 brushing trail and cleaning grade reversals.Need to finish trail from 1143 to Blue Hill summit.
2020-11-18Bob FlaggHoughton Path1Cleaned two grade reversals between 1143 and Hillside St.
2020-11-27Dexter RobinsonSkyline Trail West2.25Removed excessive leaves, leaf dams, and other debris from the trail. Picked up litter. Cleaned water bars. Got about 3/4 the way to the Eliot Circle Trail.Complete cleanup from where I stopped to Eliot Tower.
2020-12-06Anna MacDougallHalf Way Path1.5Removed some small branches. Also one medium size branch from across the pathJust regular maintenanceNo wildlife seen
2020-12-27Bob VogelFive Corners Path0.5Cleared sticks, etc. 1141 to Bartol.Joanne Newton
2020-12-02Bob VogelFive Corners Path0.5Cleared sticks from Blue Hill River Road to 1141.HUGE TREE ACROSS TRAIL, just above the street. Difficult to get over or under.