Date | Name | Trail | Hours | Work | Volunteers | Remaining Work | Comments |
---|---|---|---|---|---|---|---|
2020-01-05 | James F Green | Coon Hollow Path | 8 | 2020 Trail assessment and planning. | Bob Flagg, James M Green, Daniel P Green | Clear water bars (numerous). Repair trailhead markers (contact DCR) | James M. Green and Daniel P. Green will join James F Green as co-adopters of Raccoon Hollow Path (a.k.a. Coon Hollow Path). |
2020-01-01 | Anna Macdougall | Half Way Path | 1.15 | Removed some downed branches, but trail is in good shape. | |||
2020-01-11 | James F Green | Coon Hollow Path | 10.5 | Routine maintenance of 10 waterbars on lower trail (from trailhead to marker #1120). | James M Green, Daniel P Green | Continue maintenance of remaining water bars. | Unseasonably warm; low 60's. Trail in heavy use by mountain bikers and hikers. Trailhead and Trail terminus trail signs damaged. |
2020-01-25 | Bob Flagg | Border Path | 1 | Removed branches from trail from Unquity Rd to 1224. Cleaned swale near 1215. | |||
2020-01-25 | Bob Flagg | Massasoit Path (FBH) | 2 | Cut back trees overhanging trail, removed rocks from culvert near 1215. Brushed full length of trail. | Could use a little more work on the far end of the trail to remove brush and green briar encroaching on the trail. | ||
2020-01-23 | Bob Vogel | Five Corners Path | 2 | Picked up downed sticks, etc. | |||
2020-03-15 | Anna MacDougall | Half Way Path | 1 | Trail is in good shape. All down branches have been removed | No wildlife spotted | ||
2020-03-15 | Anna MacDougall | Half Way Path | 1 | Trail is in good shape. All down branches have been removed | No wildlife spotted | ||
2020-03-15 | Anna MacDougall | Half Way Path | 1 | Trail is in good shape. All down branches have been removed | No wildlife spotted | ||
2020-03-10 | Bob Vogel | Five Corners Path | 0.75 | Picked up sticks, etc. | |||
2020-03-20 | Bob Vogel | Five Corners Path | 1 | Cleared sticks, etc. | Bobby Vogel | ||
2020-03-20 | Bob Vogel | Skyline Trail North | 1 | Cut one tree leaning across trail E of 1141), which had been hung up in other trees. Cleared misc sticks. 1092 - 1162 | Bobby Vogel | ||
2020-03-28 | Bob Flagg | Accord Path | 2.5 | Performed all maintenance from 1001 to 1062, removed two large trees on the trail with assistance from biker passing by. Cleaned grade reversals further up trail toward 1001. | |||
2020-04-15 | Bob Vogel | Five Corners Path | 3.5 | Brushed, picked up sticks from storm, cut fallen trees. | MANY small trees along trail have been cut 3 - 4' high with a machete. Need to be cut off at the ground. | Lots of running water all along neart the 1140 intersection area. There could be a couple water bars added. Would require a bit of digging, but would greatly improve the trail in the wet seasons. | |
2020-04-15 | Bob Vogel | Houghton Path | 0.5 | Brushed, picked up sticks from storm, cut fallen trees. | |||
2020-04-15 | Bob Vogel | Houghton Hill Path | 0.5 | Brushed, picked up sticks from storm, cut fallen trees. | |||
2020-04-15 | Bob Vogel | Wolcott Path | 0.5 | Brushed, picked up sticks from storm, cut fallen trees. | |||
2020-04-15 | Bob Vogel | Wildcat Notch Path | 1 | Brushed, picked up sticks from storm, cut fallen trees. | |||
2020-04-15 | Bob Vogel | Accord Path | 1.5 | Brushed, picked up sticks from storm, cut fallen trees. | |||
2020-04-15 | Anna Macdougall | Half Way Path | 1.5 | Removed two large downed tree branches. Lots of tree damage to trees in the woods. Also, there were two trees down on the part going into Half Way Path on Accord Path (two people with a bow saw should do it)_" | Just some more cleanup | No wildlife spotted at 8.30 am. Streams running good | |
2020-04-25 | Chris Mullin | Base Path Connector | 0.25 | Brushing | |||
2020-04-25 | Chris Mullin | Circle Trail | 0.25 | Brushing | |||
2020-04-25 | Chris Mullin | Eustis Trail | 0.25 | Brushing | |||
2020-04-25 | Chris Mullin | Hancock Trail | 0.5 | Brushing | |||
2020-04-25 | Chris Mullin | Jeffries Trail | 0.25 | Brushing | |||
2020-04-29 | Dexter Robinson | Skyline Trail West | 0.5 | Picked up trash and brought home as all reservation trash cans have been removed due to the pandemic state emergency. Assessed work needed for spring cleanup. | spring cleanup: clean out water bars, remove leaf debris from stone stairs, and out of place rocks/boulders from tread-way. | ||
2020-05-10 | Bob Flagg | Border Path | 1.25 | Installed swale across trail about 7 yards up the hill from Unquity Road. Water had been running down the trail making for a muddy trail. | The side ditches further up the hill past 1175 require their annual cleaning up to 1135. | ||
2020-05-08 | Jim Green | Coon Hollow Path | 2 | Assessed trail. Minor brushing and litter removal. Had planned to rake out water bars; deferred Too many people without required mask/face covering. | Rake waterbars | Trailhead marker vandalized (previously reported). | |
2020-05-13 | Bob Vogel | Brookwood Road | 0.5 | Brushed A/R, picked up sticks from trail. | |||
2020-05-13 | Bob Vogel | Eliot Circle | 0.5 | Brushed A/R, picked up sticks from trail. | |||
2020-05-13 | Bob Vogel | Eliot Path (FBH) | 0.5 | Brushed A/R, picked up sticks from trail. | |||
2020-05-13 | Bob Vogel | Skyline Trail South | 1 | Brushed A/R, picked up sticks from trail. | |||
2020-05-13 | Bob Vogel | Trailside Path (FBH) | 1 | Brushed A/R, picked up sticks from trail. | |||
2020-05-15 | Bob Vogel | Chickadee Path (FBH) | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Chickadee Path (FBH) | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Cliff Trail (FBH) | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Coon Hollow Path | 1 | Picked up sticks, brushed A/R. Removed downed tree, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Accord Path | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Eliot Circle | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Eliot Path (FBH) | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Half Way Path | 1 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Houghton Path | 0.75 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Puddle Path | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Samoset Path (FBH) | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Skyline Trail North | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Skyline Trail South | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Summit Trail | 0.5 | Picked up sticks, brushed A/R. Removed downed tree, or photographed those too large to remove. | |||
2020-05-15 | Bob Vogel | Wildcat Notch Path | 0.5 | Picked up sticks, brushed A/R. Removed downed trees A/R, or photographed those too large to remove. | |||
2020-05-20 | Dexter Robinson | Skyline Trail West | 2.25 | Cleaned water bars for half of the adopted section, cleaned stone stairs, removed stray rocks and heavy saturated leaf debris from tread way. Picked up trash. Put rocks and branches in areas where foot traffic is off the trail. | Complete work on remaining adopted section. Cut and remove tree across trail near Rt. 138 | ||
2020-05-24 | Bob Flagg | Summit Trail | 4.5 | Cleaned two grade reversal near top of trail and small swale downslope. Removed lots of branches, rock, leaves and other debris from culvert and long side ditch. Cleared debris from large culvert at split with Green Dot. | Need to continue clearing side ditch. Also need to clear debris from brook along parking lot at trailhead. | ||
2020-05-28 | Dexter Robinson | Skyline Trail West | 1.5 | Cut and moved tree across the trail near Rt. 138. Additional work on water bars. Created barriers where hikers were stepping off trail. Completed debris and trash removal on entire section. | Noticed an increase in trail braiding. Barriers may need to be strengthened. | ||
2020-06-03 | Anna MacDougall | Half Way Path | 1.25 | Removed small branches. All in all Path is in good shape. Will need to rake out two reverses nat time out. Very dry and two streams are flowing but slowly. | |||
2020-06-10 | Dave Humphreys | Border Path | 8 | Rebuilt stone waterbar where large stones had been dislodged. Cleared, dug out, and repacked all other waterbars. | Aidan Humphreys Ben Malisheski | None | |
2020-06-10 | Dave Humphreys | Rotch Path | 1 | Cleared branches from path, cut up and removed from trail one fallen tree. | Aidan Humphreys Ben Malisheski | None | |
2020-07-06 | Bob Flagg | Wildcat Notch Path | 4.5 | Brushed trail from Hillside St to 1083 removing small trees and overhanging branches. Cleaned all drainage structures including double culvert near 1083. Performed cleanup of parking lot near trailhead. Took measurements of log bridge to add planks. | |||
2020-07-23 | Dexter Robinson | Skyline Trail West | 2 | Blocked off-trail usage area, cleaned water bars, cleared rock debris from stone stairs, brushed from Rt. 138 to Eliot Circle Trail, picked up trash | overall trail is in good shape | ||
2020-07-31 | Bob Vogel | Five Corners Path | 0.75 | Cleared sticks 1135 to 1141. Checked waterbars, they were OK. | |||
2020-08-10 | Bob Vogel | Five Corners Path | 1 | Picked up sticks from 1141 to Blue Hill River Road. Cut one tree bowing into trail. | |||
2020-08-08 | Bob Flagg | Half Way Path | 3 | Performed maintenace on length of trail. Removed rocks blocking the 24" culvert. Cleaned large grade reversal just up the hill from the smaller culvert. Also redirected the outflow from the grade reversal at the top of the trail as water was flowing back onto trail instead of the woods. | Keep an eye on the waterflow from the grader reversal at the top of the trail. | ||
2020-08-15 | Bob Flagg | Border Path | 9 | Cleaned side ditches and grade reversals from Unquity up past 1165. | Matt Panucci, Quinn Panucci, Zoey Panucci, Ethan Sokol, Anna MacDougall, Amir Degany, Joe Greeley | There are two railroad tie waterbars that have rebar rod ends sticking up from tie. These need to be pounded in or sawed off as they are a hazard. | |
2020-08-15 | Bob Flagg | Eustis Trail | 4.5 | Cleaned grade reversals from 1166 to Chestnut Run. | Anna MacDougall, Amir Degany, Joe Greeley | ||
2020-08-15 | Bob Flagg | Chestnut Run Path | 2.5 | Cleaned two grade reversals near the 1075 end of trail that were filled in and not functioning. | Matt Panucci, Quinn Panucci, Zoey Panucci | ||
2020-08-17 | Steve Murphy | Brookwood Trail | 2 | Working up from Blue Hill River Road, cleared all encroaching small brush and plants leaning into the trail. Half way up the trail, cut down two small trees (approx. 20 feet tall) that were snapped in half from the wind and were tee pee-d directly over the trail. Dragged two previously cut trees from the trail edge further off the trail. Raked out 3 water bars off accumulated brush and leaves to allow water to drain more easily No trash found on the trail | |||
2020-08-20 | Judy Jacobs | Wolcott Path | 10 | Raked side ditches. | Don Hagerty, Anna MacDougal, James Briand, Amanda Ford, Mary Blanchette | More raking. | |
2020-09-04 | Anna MacDougall | Half Way Path | 1 | Bushing back small branches, raked out two reverses | Both streams are not running one has a very small amount of water left the other is completely dry | ||
2020-09-05 | Bob Flagg | Wolcott Path | 1.5 | Cleaned two grade reversals, one just before 1141 and the second just past 1141. A large rock hit been loosened but it was too high in the structure. Selected a different rock and rearrainged another rock to fix structure. | There is a large grade reversal right after the Summit Rd that needs to be dug out and some large rotted logs removed to restore flow off the road. Also two grade reversals on either side of the side trail from Wildcat Notch Path need to be improved. | ||
2020-10-02 | Ruth Bigio | Eliot Circle | 10 | Eliot Circle Trail. Starting at #1030 to #1045 (crossing Summit Rd) to #1055. Brushing as needed. Not very overgrown but we cut back and brushed to Summit Rd. Trail widens at #1045, DCR vehicles use this section of the path. We continued to brush and cut back as per instructions from DCR. Continue on Eliot Circle from #1063, #1066 back to #1030. Pick up trash along trail. | Jean Beebe, Anna McDougall, Marnie Bolstad, Nancy Dimock | We suggest that DCR replace a trash bin by Eliot Tower. Eliot Tower is favorite spot for picnics, families and school groups. Not excessive trash on trail, but we find if there is a trash container, it will be used. (There was one in the Spring, it was removed!) | |
2020-11-07 | Bob Flagg | Coon Hollow Path | 33 | Cleaned all grade reversals from start to Wildcat Notch Trail, removed remains of large tree from trail. | Suzanne Furgal, Luke Burns, Eric Saint-Armour, Luke Saint-Armour, Mary Blanchette, Lynne Stack, Steve Libbey, Mike Prokosch, Melanie Lewis, Joe Woodman | ||
2020-11-14 | Skip Maysles | Puddle Path | 11 | Cleared water bars and brushed trail. Spent remainder of time clearing vegetation and water bars on various other nearby trails | Bill, Steve, Dan | ||
2020-11-15 | James F Green | Coon Hollow Path | 7.5 | Brushed from Wildcat to Summit. | Daniel Green, James M Green | encountered large Buck with impressive array of antlers near trail marker #1120 | |
2020-11-14 | Bob Flagg | Base Path | 1.5 | Pounded in three spikes that were sticking up from the railroad tie waterbars on trail, removed a lot of green briar near the homestead site near Unquity Road. | |||
2020-11-18 | Bob Flagg | Skyline Trail South | 2 | Performed annual maintenance on trail from Hillside St to 1143 brushing trail and cleaning grade reversals. | Need to finish trail from 1143 to Blue Hill summit. | ||
2020-11-18 | Bob Flagg | Houghton Path | 1 | Cleaned two grade reversals between 1143 and Hillside St. | |||
2020-11-27 | Dexter Robinson | Skyline Trail West | 2.25 | Removed excessive leaves, leaf dams, and other debris from the trail. Picked up litter. Cleaned water bars. Got about 3/4 the way to the Eliot Circle Trail. | Complete cleanup from where I stopped to Eliot Tower. | ||
2020-12-06 | Anna MacDougall | Half Way Path | 1.5 | Removed some small branches. Also one medium size branch from across the path | Just regular maintenance | No wildlife seen | |
2020-12-27 | Bob Vogel | Five Corners Path | 0.5 | Cleared sticks, etc. 1141 to Bartol. | Joanne Newton | ||
2020-12-02 | Bob Vogel | Five Corners Path | 0.5 | Cleared sticks from Blue Hill River Road to 1141. | HUGE TREE ACROSS TRAIL, just above the street. Difficult to get over or under. |