Chickatawbut Section Trail Work Reports – 2020
[ Back to Chickatawbut Section Page ]
Date | Name | Trail | Hours | Work | Volunteers | Remaining Work | Comments |
---|---|---|---|---|---|---|---|
2020-01-05 | Paul McPartland | Barberry Bush Spring Trail | 0.5 | Needed very little work, just minor debris to remove. The very wet western part of Barberry Brook Trail, as in my previous report, was underwater again (photos available if needed) so people were making their own ways through the woods to get around it. If it is possible to relocate this section (maybe 200’?) slightly to the north I think it would remain dry. One other note: There was a 12-14” diameter tree trunk down on Braintree Pass Path just north of the turn on to Barberry Brook Trail. | Nothing, other than possible relocation of a part of the trail as noted above. | As previously reported, the very wet western part of Barberry Brook Trail was underwater again (photos available if needed) so people were making their own ways through the woods to get around it. I think is this section (maybe 200’?) would be relocated slightly to the north it would remain dry. | |
2020-01-05 | Paul McPartland | Sassaman Notch Path | 1 | Mostly just minor debris which I removed. Not far up Sassaman Notch Trail from marker 3135 is a 4-5” diameter fallen tree partially hanging into the path. I will come back with my saw soon and remove it. There’s a similar sized one on Curve Path I’ll clean up at the same time. | Not far up Sassaman Notch Trail from marker 3135 is a 4-5” diameter fallen tree partially hanging into the path. I will come back with my saw soon and remove it. There’s a similar sized one on Curve Path I’ll clean up at the same time. | ||
2020-01-18 | Paul McPartland | Sassaman Notch Path | 1 | I returned to remove a small dead 4-6" trunk impinging on the trail that I saw a week or so ago on my last walk-thru. Rest of the trail is fine. I also removed a 6-8"" fallen trunk from Curve Path that I also noted on my last visit. | |||
2020-03-20 | Robert Shine | Skyline Trail | 2.25 | Brushed the trail from Rt. 28 to intersection with Braintree Pass Path at marker 3042. | Julie Shine, Liam Shine | Brushing the rest of the trail. | There were 3 x 8-10-in blowdowns across the path between Rt 28 and Braintree Pass Path. There was another one across the initial rock face as you start up Chickatawbut Hill and another on the side trail that bypasses the rock scramble. |
2020-04-11 | Bob Vogel | Barberry Bush Spring Trail | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Bouncing Brook Path | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Cochato Path (FBH) | 0.25 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Great Dome Foot Path | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Laurel Path | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Hemlock Path | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Lee Path | 0.25 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Romari Trail | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Squamaug Notch Trail | 0.25 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Wampatuck Path | 0.5 | Picked up sticks off trails, cut greenbriar A/R | |||
2020-04-11 | Bob Vogel | Wood Path | 0.5 | Picked up sticks off trails, cut lots and lots of greenbriar. | |||
2020-04-13 | Bob Vogel | Savoy Path | 0.5 | Picked up sticks, brushed A/R | |||
2020-04-13 | Bob Vogel | Streamside Edge Path | 1.5 | Picked up sticks, brushed A/R, Removed one log across trail | |||
2020-04-13 | Bob Vogel | Branch Path | 1 | Picked up sticks, brushed A/R, removed 2 trees across trail. | |||
2020-04-13 | Bob Vogel | Hawk Hill Path | 1 | Picked up sticks, brushed A/R | |||
2020-04-13 | Bob Vogel | Pakomet Path (FBH) | 0.5 | Picked up sticks, brushed A/R | Tree across trail | ||
2020-04-20 | Bob Vogel | Stowe Path | 0.25 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Bouncing Brook Path | 0.25 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Braintree Pass Path | 0.5 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Gas Pipeline | 0.75 | Picked up branches, brushed A/R, cut downed trees. | |||
2020-04-20 | Bob Vogel | Glover Path | 1.25 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Great Dome Foot Path | 1 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Lee Path | 0.25 | Picked up branches. | |||
2020-04-20 | Bob Vogel | Sassaman Notch Path | 0.5 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Slide Hill Trail | 0.25 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Thayer Path (FBH) | 0.5 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-20 | Bob Vogel | Tower Path (FBH) | 0.5 | Picked up branches, brushed A/R, cut downed trees A/R. | |||
2020-04-25 | Bob Flagg | Bouncing Brook Path | 1.5 | Cleaned all water structures on the trail from Rt 28 to 3130 and removed branches. | |||
2020-04-25 | Bob Flagg | Slide Hill Trail | 1.5 | Cleaned all drainage structures on trail from Bouncing Brook to 3090. | |||
2020-05-01 | Bob Vogel | Bouncing Brook Path | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Curve Path | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Endicott Path (FBH) | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Pocapawmet Path (FBH) | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Ridge Path | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Ridge Path | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Romari Trail | 0.25 | Picked up downed sticks from trail, and edges of trail. | Just south of the small bridge, on the hill on the left, there is a building. Water was running down from there, then along the trail all the way down to the bridge. I didn't have trenching tool with me, but just digging two small trenches with my heel allowed that water to drain westward to lower ground, and when I came back through 5 hours later the trail was much drier. A real trench needs to be dug to allow drainage to the wetlands to the west. | ||
2020-05-01 | Bob Vogel | Sassaman Notch Path | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Skyline Trail | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Squamaug Notch Trail | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Stowe Path | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Thayer Path (FBH) | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Tower Path (FBH) | 0.25 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-01 | Bob Vogel | Wampatuck Path | 0.5 | Picked up downed sticks from trail, and edges of trail. | |||
2020-05-10 | Bob Flagg | Romari Trail | 1.5 | Cleaned out swale across the trail near the outflow from factory upslope from the trail about 100 yards from end of Bouncing Brook Path. | The small bridge (about 10 feet long) nearby requires complete replacement in the near future. | ||
2020-06-08 | Paul McPartland | Barberry Bush Spring Trail | 0.75 | Just needed minor cleanup of debris. | Trail marker 3090 at the intersection of Barberry Bush Spring Trail and Braintree Pass was missing. | ||
2020-06-08 | Paul McPartland | Hawk Hill Path | 0.45 | As I was walking to get to my adopted trail, I ran across a 12" diameter tree across Hawk Hill Path, partially suspended about 5 feet up on one end. Looked a little sketchy to leave it there since I wasn't sure if it could eventually fall on someone passing under, so while I didn't have the tools to remove it I was able to lower it enough to step over. | Needs to be removed eventually. | ||
2020-06-13 | Bob Flagg | Bouncing Brook Path | 0.75 | Brushed trail from Laurel Path to end of trail near Romeri Path. | |||
2020-06-13 | Bob Flagg | Hemlock Path | 1 | Gave trail a good brushing, removing small trees overhanging trail. | |||
2020-06-20 | Bob Flagg | Braintree Pass Path | 3.5 | Performed brushing on length of trail, collected small bag of trash, cleaned out wood waterbar near the pipeline, cleared stones placed in front of culvert at intersection with Bouncing Brook Path. | Should remove rotting wooden waterbar near pipeline and replace with grade reversal. | ||
2020-08-09 | Bob Flagg | Cochato Path (FBH) | 2 | Walked to site for planned new bridge to remove branches and trees from site. | Joe Woodman | There is a large tree that needs to be removed before the new bridge is constructed to prevent it from falling on the bridge. | |
2020-09-05 | Bob Flagg | Bouncing Brook Path | 2 | Cleaned drainage structures from Rt 28 to Curve Path 3130 and lightly brushed trail. | The side ditches between 3051 and the Skyline Trail could use a good cleaning (about 60 yards). | ||
2020-09-05 | Bob Flagg | Sassaman Notch Path | 0.5 | Walked the trail removing branches from trail and identifying future work. | There are many grade reversals that need good cleaning on the trail from 3135 to top of hill where it intersects with the Skyline. This would be a good project for eight volunteers for a half day. | ||
2020-09-05 | Bob Flagg | Slide Notch Path | 1 | Gave good cleaning to grade reversal near 3094 and structures heading down hill to 3073. | |||
2020-09-22 | Jim Briand | Wampatuck Path | 2 | I cleared out two sections of drainage ditch about about 1/8 of a mile in from 3171. The ditches were clogged with leaves and debris. I cleaned out two water bars, one about half way from 3171 to 3153 and another about 3/4 of the way to 3153. The first bar has been about half way eroded way from wear, but I was able to clear it out a fair amount. The second one is in good shape, but was clogged. I cleared it out. I also cleared out the drainage ditch for a stretch before the water bar so they can work together. I will be returning to continue work on the ditch which is clogged for most of the trail. I also picked up trash. | There is a considerable amount of work to do in completing the work to clear the draining ditches. I will complete that over 4 visits. | Beyond what is noted above there were no immediate concerns. Trash tends to collect near 3171 due to its road adjacency and in a series of large rocks just in from the road and up a short side trail that appears to be gathering spot for occasional parties. | |
2020-09-05 | Paul McPartland | Barberry Bush Spring Trail | 1 | Walked the trail and cleaned minor debris and minor leave clogging of a few water bars, but nothing significant. In good shape | |||
2020-09-05 | Paul McPartland | Sassaman Notch Path | 1 | Walked the trail and removed minor debris and leaves clogging a few water bars, but nothing significant - generally in good shape. | Also walked Savoy Path, Hawk Hill Path (between Savoy and Braintree), Braintree (between Hawk Hill and Barberry Bush Spring Trails) and Laurel Path (between Barberry and Curve) and Curve (from Laurel to Sassamon). Did same work as noted above; saw no significant concerns along the way. | ||
2020-10-17 | Bob Flagg | Romari Trail | 0.5 | Walked trail performing light brushing and picking up small amount of trash. | |||
2020-10-17 | Bob Flagg | Bouncing Brook Path | 1 | Performed light brushing and cleaning grade reversals from Romari Path to 3073. | |||
2020-10-17 | Bob Flagg | Slide Hill Trail | 1 | Performed good cleaning of grade reversal near 3073; fixed side wall separating trail from stream along trail where rocks had been pushed into the stream. | |||
2020-10-17 | Bob Flagg | Wood Path | 0.5 | Light brushing of trail | |||
2020-11-22 | Chris Mullin | Stokes Foot Path | 0.5 | brushing | Rachel Mullin | A couple of large trees down across the path. Can step over so not critical. | |
2020-11-22 | Chris Mullin | Braintree Pass Path | 0.3 | Cut up large tree fallen on path | Rachel Mullin | ||
2020-11-21 | Bob Flagg | Carve Path | 1 | Reestablished grade reversal about 100 yards up the trail from Bouncing Brook. Structure was completely filled it. | |||
2020-11-27 | Bob Flagg | Bouncing Brook Path | 4 | Performed annual maintenance on trail removing branches from trail and cleaning all drainage structures from Rt 28 to 3130. Performed good cleaning of large culvert near 3085. | Need to clean side ditches of leaves and debris, scheduled for work event next weekend. | ||
2020-11-27 | Bob Flagg | Great Dome Foot Path | 0.75 | Brushed trail from 3111 to 3085 of small branches and beech sprouts along trail. | |||
2020-12-12 | Bob Flagg | Braintree Pass Path | 9 | Cleaned side ditch from Glover Path down to Bouncing Brook Path. Removed leaves, rocks and debris to widen and improve ditch. Cleaned ditch leading down from Glover Path. | Steve Libbey, Mary Blachette, Lynne Stack | ||
2020-12-12 | Bob Flagg | Bouncing Brook Path | 12 | Cleaned side ditch from Carve Path down to Skyline Trail. Widened ditches to improve flow, removed lots of leaves and debris. | Martina Linfield, Delia Linfield, Melissa Nelson | ||
2020-12-19 | Bob Flagg | Bouncing Brook Path | 4 | Walked trail removing heavy snow from overhanging trees and branches from Romeri Path to 3085. Removed some trees but too many to do. | Need to walk the rest of the trail to assess what trees need to be removed. | ||
2020-12-26 | Bob Flagg | Bouncing Brook Path | 3 | Walked trail from 3042 to 3151 cleaning drainage structures and removing branches from side ditches. | |||
2020-12-30 | Charlie Crosby | Carve Path | 0.5 | 50' of minor-moderate brushing near intersection with Skyline (marker 3065). Very minor drainage cleanout 100 yrds before intersection with Bouncing Brook marker 3051. | |||
2020-12-30 | Charlie Crosby | Great Dome Foot Path | 1 | Mild-moderate brushing along my entire section as discussed during my initial hike with Chris. Trail is generally in good shape. | |||
2020-12-30 | Charlie Crosby | Thayer Path (FBH) | 1.5 | Minor drainage cleanout and 20' of mild-moderate brushing coming up from Braintree Pass Path to education center. Moved a small downed tree out of the path. Put an obstruction across social path after crossing education center road. Mild-moderate brushing on about 20' of trail on each of the 3 terminus forks (R, LL, and LR) | |||
2020-12-30 | Charlie Crosby | Stowe Path | 0.5 | Some minor brushing/clearing on downhill section just below Skyline/Thayer intersection. | |||
2020-12-13 | Bob Quinn | Glover Path | 1 | cut and removed blown down trees: cleared all water bars | Dave P | ||
2020-12-13 | Bob Quinn | Hawk Hill Path | 0.5 | Glover Trail to Braintree Pass Trail: Cleared all water bars | Dave P | ||
2020-12-13 | Bob Quinn | Hawk Hill Path | 0.75 | Glover Path to #3005 Cleared all water Bars | Dave P | ||
2020-12-13 | Bob Quinn | Savoy Path | 0.25 | Cleared water bar closest to Hawk Hill Trail | Dave P | ||
2020-12-13 | Bob Quinn | Braintree Pass Path | 0.25 | cleared water bar 150 yards north of #3072 | Dave P | ||
2020-12-13 | Bob Quinn | Streamside Edge Path | 0.25 | Cleared inlet and outflow of culvert 50 yards south of #3066 | Dave P | ||
2020-12-13 | Bob Quinn | Branch Path | 0.75 | Cleared water bar; Cleared and deepened inflow and outflow at culvert; Cleared branches close to southern terminus of trail | Dave P | ||
2020-12-13 | Bob Quinn | Barberry Bush Spring Trail | 1.5 | Cleared outflow brook from ponding area 150 yards east of #3090; connected two ponds that cover trail so as to allow flow; Laid out route to better connect ponding area on trail to outflow brook; When completed this will allow for ponds on trail to drain and thus clear trail for hikers. | Dave P | need to connect t ponding area on trail to outflow |