Quarry Section Trail Work Reports – 2019
[ Back to Quarry Section Page ]
Date | Name | Trail | Hours | Work | Volunteers | Remaining Work | Comments |
---|---|---|---|---|---|---|---|
2018-11-18 | Rob Hirseman | Skyline Trail | 3 | Spent a couple of hours working on the creek fording near 4155. Main channel needs to be dug out and the bottom of the hillside regraded so that it won't keep eroding into the stream. Might warrant a work day project. | Main channel needs to be dug out and the bottom of the hillside regraded so that it won't keep eroding into the stream. Might warrant a work day project. | ||
2019-02-03 | Bob Flagg | Gas Pipeline | 0.5 | Walked trail from 4066 to 4046 removing branches from the trail. | Chris Mullin | ||
2019-02-03 | Bob Flagg | Pleasant Trail | 0.75 | Walked trail removing branches from the trail. | Chris Mullin | ||
2019-02-03 | Bob Flagg | Great Dome Foot Path | 1 | Walked trail removing branches from the trail. | Chris Mullin | ||
2019-02-09 | Bob Flagg | Adams Path (FBH) | 1 | Walked trail removing branches from the trail from Bunker Hill Lane to Ricutti Drive. Picked up two small bags of trash from the start to the top of the steps near the quarry area of the trail. Too much trash from there to the road to pickup. | |||
2019-02-09 | Bob Flagg | Shawmut Path (FBH) | 0.25 | Walked trail removing branches from the trail. | |||
2019-07-31 | Judy Jacobs | Nike Ajax Path | 26 | Pulled barberry close to Ridgwood Road. | Liz Bissell Jillian Morley Carl MacDonald Mark Ingalls Kara Echols Jeanne Musto Josh Parker David Whitney Jose Comedio Elise Pazienza Michael Cioffi Janille Hylton Elise Pazienza | More barberry. | |
2019-09-14 | Pete Tierney | Skyline Trail | 24.5 | The work completed was not on the Skyline Trail per se, rather on the short, unnamed trail that heads northeast from Skyline at intersection 4223 and terminates at Babel Rock (as it is known on old maps of the area). The trail entrance was completely obscured and we removed thick sections of briar to reveal the trail underneath. We aggressively cut back or cut down the encroaching white pines to make the trail passable again. | Chris Mullin, Diego, Drew, Rahman and two others | ||
2019-09-24 | Judy Lehrer Jacobs | Nike Ajax Path | 20 | Pulled barberry. | Jeffrey Paul, Stephen Cotter, Jill McLaughlin, David Ng Wade Stanley, Matt Hawk, Sean Herlity, Walter Heller, Anthony Hapo, Rick Kesseli | More barberry, bittersweet, multiflora rose. | |
2019-10-10 | Judy Lehrer Jacobs | Nike Ajax Path | 27 | Pulled barberry and a little bit of bittersweet up to 4010 and then a little to the right down the CCC trail. | Russell Breerley, Rob Barry, Chris Ramahan, David Olivich, Erin Arnald, Mark Manganaro, Eric DiCarlo, Neven Rabadjija, Monique Screen-Berry | More invasives along trail. | |
2019-10-05 | Judy Lehrer Jacobs | Nike Ajax Path | 17 | Pulled Japenese barberry. | Rick Kesseli, Subha Chanhi, David Vannise and others | ||
2019-03-16 | Rob Hirseman | Skyline Trail | 3 | Cleaned out grade reversals near Green Dot trail turn off near Wampatuck Rd. and near 4184. | |||
2019-10-05 | Rob Hirseman | Skyline Trail | 3.5 | Walked trail from Chickatawbut Road removing overgrowth and small dead trees. | Thomas Tan | Extensive dead trees along trail, some standing, leaning, or down across trail, particularly between Wampatuck Hill and Rattlesnake Hill. Would benefit from chainsaw or a team with handsaws. | |
2019-10-06 | Rob Hirseman | Skyline Trail | 6 | Restored old grade reversal near 4174. | Thomas Tan | ||
2019-10-19 | Bob Flagg | Sawcut Notch Path | 1.5 | Walked trail performing light brushing. Cut up large crown of branches blocking trail. Performed cleanup on parking area at trailhead. | Large tree blocking trail 150 yards E of 4083 [Reported]. Side ditch at notch needs to be reestablished to keep water off trail. | ||
2019-10-19 | Bob Flagg | Short Path | 0.75 | Performed significant brushing and removal of overhanging branches and small trees. | |||
2019-10-19 | Bob Flagg | Quarry Trail | 1.5 | Reestablished grade reversal near 4151. Removed large branch blocking trail. | |||
2019-10-19 | Bob Flagg | Crags Foot Path | 1 | Walked trail performing minor brushing, removed medium sized tree from trail. | |||
2019-10-20 | Bob Flagg | Indian Camp Path | 1.5 | Walked trail performing minor brushing, removed large crown of branches from trail. | |||
2019-10-20 | Bob Flagg | Furnace Brook Trail | 0.75 | Walked trail performing light brushing. | Large double trunk tree about 100 yards from 4120 [Reported]. | ||
2019-10-20 | Bob Flagg | Great Dome Foot Path | 0.5 | Walked trail performing minor brushing from 4090 to 4073. | |||
2019-10-20 | Bob Flagg | Pleasant Trail | 1 | Walked trail performing minor maintenance. Culvert was blocked at Pine Tree Brook by two capstones that had fallen from top of culvert. Removed blockage. | Need to reseat the two capstones on top of the culvert. Will need few people to perform work. | ||
2019-10-20 | Bob Flagg | Pine Tree Brook Path | 0.75 | Walked trail performing minor brushing from 4049 to 4084. | |||
2019-10-20 | Bob Flagg | White Tail Path (FBH) | 0.25 | Walked trail performing minor maintenance. | |||
2019-10-20 | Bob Flagg | Fox Hill Path | 0.5 | Walked trail performing minor maintenance from 4096 to Chickatawbut Rd. | |||
2019-10-26 | Bob Flagg | Pasture Run | 0.75 | Performed minor brushing on trail removing branches on ground and overhanging branches. | Need to reestablish grade reversal at the fork in the trail near Chickatawbut Rd to keep water from flowing down the trail. | ||
2019-10-26 | Bob Flagg | Ridge Path | 0.5 | Performed minor brushing on trail removing branches from trail. | |||
2019-10-26 | Bob Flagg | Sassaman Path | 1 | Performed minor brushing on trail. Cleaned debris from grade reversal just E of 4047. | It would be great to add a grade reversal just W of 4047 as the grade reversal cleaned above is easily filled in. | ||
2019-12-16 | Paul Brookes | Murphy Path | 0.75 | Brushed path and used loppers to remove overhangs. | Pete Tierney | None | |
2019-12-16 | Paul Brookes | Ski Jump Path (FBH) | 0.25 | Walked, nothing needed to be done. | Pete Tierney | None | Along with the ski jump path (that follows the removed wooded ski jump), a second parallel path has been created by walkers 20 feet to the south of the ski jump path. This is a better path than the ski jump path as it has less skree and is slightly less steep. Lots of beer cans and trash at the top of Ski Jump path. |
2019-12-16 | Paul Brookes | Winter Carnival Path (FBH) | 0.5 | Brushed and cleared path. Cut overhangs and dragged to the side some branches that had fallen across the path. | Pete Tierney | None | |
2019-12-16 | Paul Brookes | Firepit Path | 0.75 | Brushed and cleared path. Pulled to the side some branches that had fallen across the path. Used loppers to remove overhangs. | Pete Tierney | The trunk of a medium-sized tree (approx 2ft diameter) has fallen across the wooden plank-walk just before the firepit path intersects with the skyline path. This is the plank-walk that was installed a couple of years ago as an eagle scout project. The trunk needs to be cut and removed from the walkway. The weight of the trunk has unfortunately broken one of the planks and that plank needs to be replaced. | The wooden plan-walk stops approximately 100 feet from a second stretch of lowlands that floods during rain. A drainage ditch could easily be dug that would drain this area into the pond 50 feet to the East. The ditch needs to traverse only about10 feet of flat ground before the land inclines down to the pond. |
2019-12-16 | Paul Brookes | Minichiello Path (FBH) | 0.75 | Brushed and cleared path; used loppers to remove overhangs. | Pete Tierney | One of the cross-slats 1/3rd of the way across the bridge has rotten through, broken and half the slat is missing. | 1. The bridge that crosses the southern edge of the South St Moritz Pond is, in my opinion, getting dangerous and needs repair very soon. 2. Where the Minichiello path intersects with the green dot pipeline at 4205 there is about a 10-foot climb up an approximate 20-degree slope of scree. This would benefit from the construction of three or four steps. |
2019-12-16 | Paul Brookes | Obbatinewat Path (FBH) | 0.5 | Brushed and cleared path, used loppers to remove overhangs. | Pete Tierney |