Use the Filter button to select reports from only one trail, or park section. There are six sections: Neponset, Blue Hill, Ponkapoag, Houghton, Chickatawbut, and Quarry.
Date | Name | Section | Trail | Work | Remaining Work |
---|---|---|---|---|---|
11/16/2018 | Noel Keady | Neponset | Field Path | Myself and several of our volunteers walked Orchard Path, Swamp Trail, and Field Path which was currently under construction. As there was snow on and ground, we used this day mostly as a way to familiarize several of our volunteers with the area for future projects in the area. We spent most of our time walking the trail. We stopped to remove Asian Bittersweet but were unable to pull up roots due to the ground being pretty solid/frozen. We also cleared some fallen branches from the trail itself including a rather large branch that had rested across the path a tad bit above head height. Ideal widowmaker removed. | There is a lot of asian bittersweet in the area (where isn't it these days?). Our hope to return in warmer months to pull many of these plants up by their roots and help clear brush and debris from trails in this general area. |
01/05/2019 | Bob Flagg | Blue Hill | Summit Trail | Cleaned culverts and side ditch (about 40 yards) at intersection with Green Dot Trail. Ditch was blocked with branches, rocks and dirt. | Need to continue cleaning remainder of ditch. Also need to walk the trail to develop complete restoration of existing structures to improve flow. |
11/17/2018 | Rob Hirseman | Quarry | Skyline Trail | Spent a couple of hours working on the creek fording near 4155. Main channel needs to be dug out and the bottom of the hillside regraded so that it won't keep eroding into the stream. Might warrant a work day project. | Main channel needs to be dug out and the bottom of the hillside regraded so that it won't keep eroding into the stream. Might warrant a work day project. |
01/18/2018 | Barry Young | Neponset | K Path | Walked trail looking for down branches, removal of small limbs, picked up trash. | This trail just needs continuous monitoring for downed branches and trash pick up, particularly near Royal Street. |
01/18/2018 | Barry Young | Neponset | Moulton Path | Removed down branches and picked up trash. There were some significant large limbs requiring removal. | There is a large leaning tree just north of the Hemenway bench which at some time should be removed. |
01/18/2018 | Barry Young | Neponset | Cosmos Path | Removed a small tree which had come down between 6830 and 6877. Removed a large branch limb between 6670 and 6830. Removed significant amount of âpartyâ trash by the spur from the spur from Green Street up to the path by 6830. | This path needs continuous monitoring for downed limbs, trees, and trash. It is impossible to keep the area by the parking lot free of trash. Trash barrels might help in the parking lot. |
01/11/2019 | Bob Flagg | Blue Hill | Bartol Path | Performed light brushing on trail. | |
01/11/2019 | Bob Flagg | Blue Hill | Carberry Path | Performed light brushing on trail. Removed thorn bushes along the trail. Remove small amount of trash. | |
01/12/2019 | Bob Flagg | Chickatawbut | Reservoir Path (FBH) | Walked loop trail picking up a good amount of trash (packed small bag). Removed few branches. | |
01/12/2019 | Bob Flagg | Chickatawbut | Pakomet Path (FBH) | Removed branches along the trail. Removed small bag of trash. | |
01/12/2019 | Bob Flagg | Chickatawbut | Pocapawmet Path (FBH) | Performed significant brushing by removing many small pine trees along trail. Cleared huge branch hanging over trail. | |
01/06/2019 | Sandra Johnson | Blue Hill | Chestnut Run Path | Cleared culvert of leaves. Cleared ditch and all water run off areas of leaves. Picked up big sticks and moved them off trail. | |
01/17/2019 | Sandra Johnson | Blue Hill | Chestnut Run Path | Touched up | None until spring! |
01/18/2019 | Bob Flagg | Houghton | Headquarters Path | Performed minor brushing removing branches from trail for section that crosses road. Picked up small bag of trash. | |
01/18/2019 | Bob Flagg | Houghton | Quincy Path (FBH) | Performed minor brushing removing branches from trail. Removed debris blocking flow at small bridge. Picked up half small bag of trash. | Need to remove rocks under small bridge to improve flow. |
01/25/2019 | Bob Flagg | Houghton | Hoosicwhissick Path (FBH) | Walked path along Houghtons Pond picking up small pieces of trash like butts, bottle caps and straws where the debris washes ashore. Removed branches from trail. | Pond was frozen so good shore cleanup should be done when the water thaws. |
01/25/2019 | Bob Flagg | Houghton | Prescott Foot Path | Walked path along Houghtons Pond from intersection with Hoosicwhissick Path to end of trail near concession stand.Picked up small pieces of trash like butts, bottle caps and straws where the debris washes ashore. Removed branches from trail. | Pond was frozen so good shore cleanup should be done when the water thaws. |
01/25/2019 | Bob Flagg | Houghton | Headquarters Path | Removed branches from trail from parking lot near State Police office to intersection with White Pine Path. Cleared large section of green briar from both sides of trail. Picked up small bag of trash. | |
01/25/2019 | Bob Flagg | Houghton | White Pine Path (FBH) | Removed branches from trail. | |
02/01/2019 | Bob Flagg | Blue Hill | Eliot Path (FBH) | Walked path removing branches from the trail. | |